5 Dec.

ADS project at KURRI , Mishima(KURRI)

Workshop addressing , Mori(KURRI)

BNCT at KURRI , Ono(KURRI)

Limits of MA cavity , Ohmori(KEK)

PRISM status report , Sato(Osaka Univ.)

Correct tracking in FFAG , Berg(BNL)

 

6 Dec.

Status of 150MeV FFAG , Aiba(KEK) Movie file

Proton FFAG Accelerator Work at Brookhaven National Laboratory, Ruggiero (BNL)

FFAG studies at RAL , Rees(RAL)

Non-scaling FFAGs in UK , Johnstone(instead of Edgecock)

Status of 6D transmission simulation in FFAGs , Meot(DAPANIA/LPSC)

Tracking study of muon acceleration with FFAG , Machida (RAL)

 

7 Dec.

Design of FFAG-ERIT , Okabe(KEK), Answers Mori(KURRI)

Diagnostics for FFAG accelerators , Itahashi (Osaka Univ.)

Fermilab, Proton Driver, PRISM/PRIME , Neuffer (FNAL)

FFAG Accelerator For Ibaraki Proton Therapy Facility , Yokoi (Iabaraki Pref.)

Development of PRISM-FFAG Magnet , Arimoto (Osaka Univ.)

Status of FFAG Complex at KURRI , Tanigaki (KURRI)

Deep Underground and Sea Nuclear Park Accelerator Facility , Takahashi(BNL)

 

8 Dec.

Projects in the near and far future:
Beijing Spallation Neutron Source / Antiproton Generation & Storage Facility

Wei (IHEP / BNL)

ICOOL Simulatioin of Berg Doublet Lattice , Palmer (BNL)

Neutrino Factory International Scoping Study , Chris Prior (RAL)

Crossing 3Nx=11 in KEK 150MeV FFAG , Aiba (KEK)

FIXED FIELD SYNCHROTRON –APPLICATION: SECOND GENERATION MEDICAL SYNCHROTRON

Meot (DAPNIA/LPSC)

 

9 Dec.

Tracking study of muon acceleration with FFAG (follow-up 1) , Machida (RAL)

Summary talk , Berg (BNL)

 

 

Proton acceleration with added edge focusing , Trbojevic (BNL)